Weekly Road and Traffic Report for the Week of Oct. 12-18

road-work-safe-to-use

For the Week of October 12 – 18:

  • NE 3rd Street between NE Greenwood Avenue and NE Emerson Avenue for asphalt crack sealing and pavement marking replacement, single lane closures with minimal delays, 10/12/20 – 10/30/20, 5 a.m. – 9 a.m.
  • Brosterhous Road between SE Orchard Grass Place and Windsor Drive for franchise conduit work, 10/12/20 – 10/16/20
  • Intersection between NE Purcell Boulevard and NE Butler Market Road for geotechnical work, traffic signal shutoff with flagging across all four legs of traffic, expect delays, 10/15/20 – 10/16/20, 9 a.m. – 3:30 p.m.

Ongoing Closures:

  • Northwest Crossing Farmer’s Market, every Saturday from 6/20/20 – 10/17/20, 10 a.m. – 2 p.m. The following streets will be closed:
    • Fort Clatsop Street between Ordway Avenue and John Freemont Street
    • John Freemont Street between Fort Clatsop Street and Ordway Avenue
  • NE Quimby Avenue between NE 8th Street and NE 11th Street for utility and street construction, full daytime road closure, 8/19/20 – 10/30/20
  • NW Nordic Avenue between NW Marken Street and NW Mt Washington Drive for infrastructure improvements, full road closure with detour, 9/21/20 – 10/30/20
  • NW Riverside Blvd closed between NW McCann Avenue and NW McKay Avenue for infrastructure installation related to the Drake Pump Station Project, full road closure with detour to NW Riverfront Street, 7/27/20 – 11/13/20
  • NW Congress Avenue closed at NW Riverside Avenue intersection for infrastructure installation related to the Drake Pump Station Project, full road closure, 7/27/20 – 11/13/20
  • Intersection of SE Murphy Road and SE Country Club Drive for roundabout construction, full intersection closure with bypass road constructed to provide local and emergency access to Country Club Drive, construction began 9/8/20 – 11/20/20
  • SE Greenmont Drive between SE Westview Drive and SE Desert Woods Drive for infrastructure installation, full road closure with detour, 10/1/20 – 1/29/21

 

Work schedules are dependent on weather conditions and other factors.

 

Contact: Kyle Thomas, Construction Manager

541-323-8519, kthomas@bendoregon.gov

 

For Street Preservation related questions: Paul Neiswonger, Streets Supervisor

541-317-3035, pneiswonger@bendoregon.gov

 

Closures and detours in Bend are updated weekly at: www.bendoregon.gov/traffic

 

Find more information about street operations at: www.bendoregon.gov/streetpreservation

 

Weekly reports can be received via email by subscribing to Weekly Road and Traffic Reports at: www.bendoregon.gov/enews

ADA wheelchair icon.

Accommodation Information for People with Disabilities  

To obtain this information in an alternate format such as Braille, large print, electronic formats, etc. please contact Anne Aurand at 541-388-5573 or aaurand@bendoregon.gov.

 

cropped-new-logo-for-website-2

4th Annual Wildlife Baby Shower

Join Think Wild at Oregon Spirit Distillers in Bend on May 19 from 3-6 PM to help your local wildlife hospital raise funds & supplies to care for injured and orphaned native wildlife in need this baby

scaled_768-5

Beaver Walk & Beaver Believers Screening

Beaver Natural History Walk & Restoration Site Tour, 4-5 pm Followed by a screening of The Beaver Believers and Q &A Hosted by Maureen Thompson, Beaver Works Program Manager and Kolleen Miller, Education Director for The Upper