Sisters – Utility Work May Briefly Disrupt Traffic on Suttle Lake Road

Sisters, Ore. – Over the next 4 to 5 weeks the public may experience brief delays and potential traffic congestion on Suttle Lake Loop Road while a powerline is installed along the road.

Central Electric Cooperative will be doing trench work in roadbed of Suttle Lake Loop Road to replace 11,000 linear feet of 12500-volt underground powerline. The work will begin where the road intersects Highway 126 W. and approximately end at the turn to Link Creek campground on Suttle Lake.

The public should be aware of workers in the area and will see flaggers on the road. Though there may be brief delays and some congestion, project managers are not expecting travelers to be significantly impacted.

Following the installment of the powerline, Central Electric Cooperative crews will continue working in the area, but traffic should not be affected.

rhub-2-1024x705

Annual Rhubarb Festival

This event started in La Pine at L & S Gardens. Upon the retirement of Linda she graciously passed the event on to the La Pine Senior Activity Center.  Each year the community, gathers with everything Rhubarb.

cropped-new-logo-for-website-2

4th Annual Wildlife Baby Shower

Join Think Wild at Oregon Spirit Distillers in Bend on May 19 from 3-6 PM to help your local wildlife hospital raise funds & supplies to care for injured and orphaned native wildlife in need this baby