
Road construction season is upon is in Central Oregon. The city of Bend has scheduled work on several city streets and neighborhoods. They remind you to slow down, read the signs and stay on the designated detour routes. Frequent updates are also posted here.
- NW Skyline Ranch Road between NW Chianti Lane and NW Shevlin Meadow Drive for infrastructure installation, full road closure, begins 4/12/2021
- Brosterhous Road between SE Orchard Grass Place and Windsor Drive for railroad overcrossing inspections, full road closure with detour, 4/13/21, 10 a.m. – 2 p.m.
- Deschutes Market Road between Margaret Lane and Pioneer Loop for infrastructure installation related to the north interceptor project, single lane closure with flagging, 4/15/21, 9 a.m. – 3 p.m.
- NW Skyliners – Mt Washington Intersection – Closed for roundabout reconstruction and pedestrian crossing updates from March 29th – April 23rd. For further information on this and future street preservation work, visit bendoregon.gov/
streetpreservation. - McClain Drive between NW Shevlin Park Road and NW Shevlin Meadow Drive for infrastructure installation, work began 11/30/20
- SW Colorado – Columbia intersection – Closed for Roundabout construction beginning March 1st – mid-May. Additional road closures related to closure listed below. For further information, visit bendoregon.gov/Columbia-
roundabouts. - Colorado Avenue between SW Emkay Drive (west) and SW Emkay (east)
- SW Columbia Avenue closed between SW Emkay Drive and SW Disk Drive
- Desert Woods Neighborhood Extension Project – Roads closed for Sewer main installation with local access, 3/8/21 – 5/31/21. For further information, visit bendoregon.gov/desertwoods.
- East Lake Drive between Twin Lakes Loop and Newberry Drive
- Twin Lakes Loop Between SE 15th Street and Newberry Drive
- SE Murphy Road between Country Club and Parrell Road for roadway widening and modernization, full road closure with local access and detours, November 2020 – Summer 2021
- US HWY 97 between Exit 135A and Exit 139 to Reed Market Road for ODOT overnight resurfacing, southbound lanes with detour onto US 97 Business Route (3rd Street). 3/15/21 – 5/15/21
- US HWY 97 between Exit 139 and Exit 141 to Murphy Road for ODOT overnight resurfacing, southbound lanes with detour onto US 97 Business Route (3rd Street). 3/15/21 – 5/15/21
- SW Simpson Avenue between SW 15th Street and SW 18th Street for right of way improvements, full road closure with detour, 3/15/21 – 5/1/21NW 10th Street at Newport Avenue for infrastructure installation, full road closure, 3/21/21 – 4/13/21
- Newport Corridor Improvements Project – Various intersections along Newport Avenue to be closed due to updates in the water main and stormwater facilities. Road closures related to the project listed below.
- NW Nashville Ave between NW Drake Road and NW Newport Ave for infrastructure installation, full road closure, starting 4/5/21
- Intersection of 9th Street and Newport Avenue for infrastructure installation, full roundabout closure with detour, starting 4/5/21